Overview with affiliate links. We receive a commission if you click through via us. Read how
Compare

Planning GPU capacity for peak load and experiments

How to plan GPU capacity for steady workloads, peaks and experiments without overpaying.

Door de redactie van ClouwinoGepubliceerd Laatst bijgewerkt

Short answer

Split your work into three layers: a steady base that runs constantly, peaks that can be predictable or unpredictable, and experiments that are temporary. Cover the base with reserved or own capacity, the peaks with scaling and the experiments with temporary or interruptible capacity, and measure usage.

Who is it for: Teams with varying GPU use who want to keep capacity and costs in balance.

Split your workload

Not all AI work is equal. Inference for a live service is constant and needs reliability. Training runs in short, heavy periods. Data scientists’ experiments vary and can often wait.

Cover the base

For work that runs constantly you choose fixed, predictable capacity, for example reserved for a longer period or on your own hardware. That is usually more favourable per hour than taking capacity ad hoc each time, but you also pay when you do not use it. So make sure the base is really right.

Absorb the peaks

You can absorb peaks with automatic scaling or with extra capacity on demand. With GPUs, extra capacity is not necessarily available immediately. Ask providers how that works and test it before you count on it. A queue for tasks that can wait reduces the peak.

Manage experiments

Measure and adjust

Measure the utilisation of your GPUs and compare it with what you have purchased. Also record who is responsible for stopping unused environments and when you review capacity. These agreements prevent costs from creeping up unnoticed. A low utilisation rate means you have too much or that data arrives too slowly. Look at usage monthly and adjust your purchasing.

Type of work and suitable capacity

A general approach.
Type of workCharacteristicSuitable capacity
Live inferenceConstant, reliableFixed base, possibly with scaling
Scheduled trainingHeavy, temporaryCapacity for the duration of the run
ExperimentsVarying, can waitTemporary or interruptible with limits
PeaksUnpredictableScaling or queue

Who is it not ideal for?

Frequently asked questions

What if no GPUs are available?

Plan ahead, spread across regions or providers, and let work that can wait sit in a queue.

What is a good utilisation rate?

That differs per project. Measure the actual utilisation and find out why it is low before you add capacity.

How do I limit the costs of experiments?

With automatic shutdown, limits per project and interruptible capacity.

Ask us
Compare Get in touch

Are you sure?