Planning GPU capacity for peak load and experiments
How to plan GPU capacity for steady workloads, peaks and experiments without overpaying.
Split your work into three layers: a steady base that runs constantly, peaks that can be predictable or unpredictable, and experiments that are temporary. Cover the base with reserved or own capacity, the peaks with scaling and the experiments with temporary or interruptible capacity, and measure usage.
Who is it for: Teams with varying GPU use who want to keep capacity and costs in balance.
Split your workload
Not all AI work is equal. Inference for a live service is constant and needs reliability. Training runs in short, heavy periods. Data scientists’ experiments vary and can often wait.
Cover the base
For work that runs constantly you choose fixed, predictable capacity, for example reserved for a longer period or on your own hardware. That is usually more favourable per hour than taking capacity ad hoc each time, but you also pay when you do not use it. So make sure the base is really right.
Absorb the peaks
You can absorb peaks with automatic scaling or with extra capacity on demand. With GPUs, extra capacity is not necessarily available immediately. Ask providers how that works and test it before you count on it. A queue for tasks that can wait reduces the peak.
Manage experiments
- Let environments shut down automatically when they are not in use.
- Use temporary or interruptible capacity for work that can resume.
- Set limits per team or project, so that one experiment does not drain the budget.
- Make results and intermediate steps repeatable, so you do not have to run them again.
Measure and adjust
Measure the utilisation of your GPUs and compare it with what you have purchased. Also record who is responsible for stopping unused environments and when you review capacity. These agreements prevent costs from creeping up unnoticed. A low utilisation rate means you have too much or that data arrives too slowly. Look at usage monthly and adjust your purchasing.
Type of work and suitable capacity
| Type of work | Characteristic | Suitable capacity |
|---|---|---|
| Live inference | Constant, reliable | Fixed base, possibly with scaling |
| Scheduled training | Heavy, temporary | Capacity for the duration of the run |
| Experiments | Varying, can wait | Temporary or interruptible with limits |
| Peaks | Unpredictable | Scaling or queue |
Who is it not ideal for?
- Those who use only one small GPU: a simple purchase is enough.
Frequently asked questions
What if no GPUs are available?
Plan ahead, spread across regions or providers, and let work that can wait sit in a queue.
What is a good utilisation rate?
That differs per project. Measure the actual utilisation and find out why it is low before you add capacity.
How do I limit the costs of experiments?
With automatic shutdown, limits per project and interruptible capacity.
